Studio progress update
Monday tea time
Where did the Easter holiday go? Why am I sooooo tired? Why am I skint? Why is there a huge pile of washing up in the kitchen, you know, all the posh stuff you don’t want to ruin in the dishwasher? Why are there masses of glass jars and bits all over the lounge floor? and who left that shed in pieces around the side of the house?
OK, so here’s the plot, Monday before Easter we emptied my studio, that took longer than I thought it would, even with my packing things and tidying stuff away the week beforehand. Late Monday afternoon Rick removed the benches, power and stuff screwed to the walls. Tuesday we took the shed apart and carted it around the side of the house, this was very enjoyable as there was no way I could have done that for the last 10 or so years previous. Then Rick started excavating the plot to lay the next 12 slabs we needed, including digging out the pesky Virginia Creeper shoots and ivy plants everywhere. We managed to fill 2 of those Hippo bags you can get from builders merchants with the soil from the slope, which didn’t look particularly slopey until he started digging of course. Then he had to lug 12 bags of sand, 12 huge slabs, move the 2 heavy sleepers that were holding back the lawn, then move them 3 or 4 more times as they kept gettong in the way. After the slabs were laid we started repairing the surrounding fences, and removed 2 panels from the back of our garden so that we have slightly more room to walk along the back of the new studio to remove leaves and stuff. The panel removal revealed a huge tangle of more Virginia Creeper, which all had to be prised off the fence and chopped to fill the recycling bags, and the huge root dug up and disposed of. I also went around the garden and pulled out all the brown long leaves from the Crocosmia and grasses around the place, cut back the Pyrocantha and the Fatsia Japonica to reveal the Hellibores we planted last spring, and generally got rid of the plant rubbish. I then attacked the front garden border and had several subsequent trips to the dump, which in itself was entertaining as the bags were so heavy I had to drag them, then pull individual handfuls of plant bits into the skips until the bag was light enough to pick up and tip the contents away. Phew. Oh and we also had 2 trips down to look at cars, one of them to buy a car we wanted and had rung up to check it was still there, only to be told casually ‘Oh we sold that one yesterday’ when we got there. Typical.
That’s the progress so far, we now have to finish repairing the fences, paint them, and decide how many new sleepers and slabs we need to complete the area around the studio and the path down to it. I also need to organise the insulating materials, the internal cladding, the flooring, the ventilation and what benches I want. I’m also trying to choose a couple of lovely garden shades to paint the shed when it’s been up for a while. That’s all the good news, the bad news is that I’ve been let down on when the studio is being delivered, which is after I was supposed to be starting teaching again. This is very annoying and stressful because I now have almost 3 weeks without a studio, the time slot that I had planned for fitting out my studio perfectly, and now we have to make it just ‘OK’ to start teaching on time, and that’s with having had to rearrange a couple of students to come in June instead now. Of course even OK will be plenty to actually teach properly, it just won’t be fixed up permanently and decorated.
As far as the rest of the holiday and my tireness, that’s probably down to going away to the Flame Off last Friday and Saturday, but thats another post!